Project Timesheet Time Control And Project WIP Supply Cost- Resolve Dysfunction
Resolve dysfunction of module Project Timesheet Time Control when installing WIP modules.
Conditions générales
Garantie satisfait ou remboursé de 30 jours
Expédition : 2-3 jours ouvrables
Project Timesheet Time Control And Project WIP Supply Cost - Resolve Dysfunction
This module resolves the dysfunction caused when installing the modules:
- project_wip_supply_cost
- project_timesheet_time_control
Bug:
When we switch to a new timer and the system modify the previous timesheet line to set the amount, we consider that 2 extra lines are added by the Project WIP Supply Cost and those lines doesn't contain any employee.
The error is reported in the context of the project 'Fix', see screenshot bellow:
Solution:
Before creating a shop supply line, it is necessary to remove either the default project or default task that is associated with the analytic line created when clicking the "start work" button. The shop supply line should not be linked to any task or project.
Contributors
- Numigi (tm) and all its contributors (https://bit.ly/numigiens)